This patch corrects a problem in mptfc which can result in targets
being removed after executing an "lsiutil 99" reset of the fibre
channel ports.
The last rescan event was being processed before the setup reset work
due to an inappropriate optimization in the event processing logic.
Every rescan event is now queued for execution and the setup reset
work now executes in the proper sequence.
Signed-off-by: Michael Reed <mdr@sgi.com>
Acked-by: Moore, Eric <Eric.Moore@lsil.com>
Signed-off-by: James Bottomley <James.Bottomley@SteelEye.com>